01309 676911

Solar for lower-carbon timber

Location

Dunphail

Sector

Commercial

Project
highlights

System size

92 kWp

Solar PV

200 panels

Consumption offset

60%

Technologies installed

The brief

Logie Timber wanted to add onsite renewable generation to a business already built around responsible material choices. 

aes renewables installed a 92 kWp solar PV system on the company’s new shed, helping support the energy demands of its timber operation. 

Our approach

aes renewables installed a 92 kWp solar PV system across the new shed. 

The system was designed to provide onsite renewable generation for a technology-led sawmill with high-precision timber machinery. 

The outcome

The installation adds solar PV to a site already shaped by practical, low-impact choices. 

The system is listed with 71,825 kWh of generation, 18 tonnes of CO₂ reduced per year and 60% consumption offset. 

Why it works

This project works because the solar PV system supports the way the business already operates. 

For Logie Timber, onsite renewable generation is another part of a wider commitment to responsible production, helping power the machinery behind its timber work. 

If your business is looking at solar PV, we’ll help you understand what could work for your site.

Start your conversation

Find out what’s possible for your site

Designed with care.
Installed with pride.
Supported for the long term.
Feeling good energy.

We believe renewable energy should feel right. From the first conversation to long after your system is installed.